Apr 16 2021 (14:25) MaldaAnandviharElectric Loco ExpressLockdown FirstRun No: 03429 #03429 First Run with Electric Locomotive Asansol WAP4 FullyUtkrist of Coach #03429Train TrainArrived Coach Bhagalpur Composition JunctionElectrification Train: beforeclearadvantage 1 Train AC covered 2 75km Tier, Sahibganj 4 Bhagalpur AC section 3-tier, in 11 1hr Sleeper, 10min 6 for General(2S), First 2 Time SLR (This Train Runs Arrived Non 10minutes Stop before between clear Sbg advantage to of Bgp) Electrification Train covered 75km section in 1hr 10min for First Time (This Train Runs Non Stop between Sbg to Bgp)
Apr 16 2021 (13:48) Station Tag: Anand Vihar Terminal/ANVT added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Ghaziabad Junction/GZB added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Moradabad Junction/MB added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Bareilly Junction/BE added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Pratapgarh Junction/PBH added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Amethi/AME added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Rae Bareli Junction/RBL added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Lucknow Charbagh NR/LKO added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Varanasi Junction/BSB added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Pt. DD Upadhyaya Junction (Mughalsarai)/DDU added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Patna Junction/PNBE added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Kiul Junction/KIUL added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Jamalpur Junction/JMP added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Barharwa Junction/BHW added by BhagalpurRail/778159
Apr 16 2021 (13:48) Station Tag: Malda Town/MLDT added by BhagalpurRail/778159
Train Arrived #BhagalpurJunction 10minutes before clear advantage of Electrification. Train covered 75km #Sahibganj#Bhagalpur section in 1hr 10min for First Time. (This Train Runs Non Stop between Sbg to Bgp)
Passenger 1: PQWL# 4 (Booking Status: PQWL# 12) Total Fare: 1125 Chart NOT Prepared Please analyze this PNR, and predict the final Charting Status. Thanks.
Passenger 2: RAC 11 (Booking Status: W/L 77,GNWL) Total Fare: 3330 Chart NOT Prepared Please analyze this PNR, and predict the final Charting Status. Thanks.
Passenger 2: Waitlist# 2 (Booking Status: W/L 4,RLGN) Total Fare: 3290 Chart NOT Prepared Please analyze this PNR, and predict the final Charting Status. Thanks.
Latest Status: Mar 23 2017 (16:58:18)
Passenger 2: B2,22 [UB]/Coach Position:8 (Booking Status: W/L 4,RLGN) Total Fare: 3290 Chart NOT Prepared
Important Note:This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.