CRS inspection of newly electrified Raniganj-New Coochbehar section, 94 RKM/146.05 TKM, was done successfully on 4.1.21 by electric loco trial. The electrification of this entire railway track upto Guwahati is with
#RVNL. This is the first electrified stretch on this route.(1/2)
Source : RNVL