Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue Sep 17 19:05:02 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Filters:

Page#    732 Blog Entries  <<prev  next>>
Rail News
55918 views
1

IR Affairs
ECR/East Central
Jun 21 (20:52)   Bihar: Railway to Double Line Between Jamalpur and Munger, Investing ₹1890 Crore

Exynos9611~   19445 news posts
Entry# 6102501   News Entry# 557138         Tags   Past Edits
1 compliments
Useful
बिहार में यहां रेलवे खर्च करेगी 1890 करोड़, पुल से लेकर बिछेगी नई रेल लाइन, 5 जिलों को फायदा

The Indian Railways is investing 1890 crore rupees to double the railway line between Jamalpur and Munger in Bihar. This project will benefit people in 5 districts of Bihar and enhance the railway network in the state. The project will include the construction of a second track on the Y lane...
more...
between Ratanpur and Munger. This will improve rail traffic between Jamalpur and Munger, as well as between Munger and Bhagalpur. It will also enable the operation of more goods trains, increasing railway revenue. The project also includes the construction of a new bridge alongside the existing Sri Krishna Setu bridge over the Ganga river in Munger. This bridge has been a long-awaited project, with its feasibility being explored during the Atal Bihari Vajpayee government. The final location survey and DPR for the project have been completed, and the construction work is expected to begin soon. The doubling of this rail line, which was approved two years ago, will increase train traffic and improve passenger convenience, benefiting people in Jamui and Banka districts as well.

Indian Railways Bihar mein 1890 crore rupees spend karne wali hai, aur isse Bihar ke 5 district ke logon ko direct fayda milega. Isse railway ko revenue bhi hoga aur Bihar mein rail network aur strong ho jayega. Bihar ke Munger district mein Jamalpur se Munger tak rail line...
more...
ko double kiya jaayega. Isme 1890 crore rupees kharch honge. Ratanpur se Munger jaane wali Y lane pe bhi dusri rail patti bichai jaayegi. Isse Jamalpur aur Munger aur Munger aur Bhagalpur ke beech rail traffic mein suvidha hogi. Saath hi goods trains ke zyada chalne se railway ko zyada revenue bhi milega. Munger mein Ganga river pe ek bridge ban sakta hai. Abhi Munger district mein Ganga river pe bane Sri Krishna Setu pe single rail line guzarti hai. Jamalpur se Munger ke beech double karne se ab is bridge ke paas ek dusra bridge banne ki bhi aas lagi hai. Atal Bihari Vajpayee ke shaasankaal mein Munger ke railway bridge ko green signal mila tha aur tab se hi iske double karne ki maang bhi uthti rahi hai. Par ab DPR ready ho jaane ke baad logo mein iski umeed jagi hai. Munger mein railway line ke double karne ko lekar final location survey kar liya gaya hai aur DPR ready kar liya gaya hai. Ab jaldi hi double line ke nirman kaam ko anjaam de diya jaayega. Jamalpur Munger rail line ke double karne ke kaam ke liye survey ka kaam 2 March 2022 se hi shuru kiya gaya tha. Iske tahat drone aur photo grammetry technology ka use karke aerial survey kiya gaya tha. Ab jaake iska DPR banaya gaya hai. Jamalpur Munger railkhand ke double hone se is rail khand pe trains ki aawazahi badhegi aur yaatriyon ko various types ki suvidha milegi. Jamalpur ke Y lane ke double karne ka kaam samapn hone se Bhagalpur se Munger hote hue Khagaria aur Begusarai jaane wali train ki sankhya mein bhi izafa hoga aur iska fayda Jamui aur Banka ke logo ko bhi milega. Ab logo mein is railkhand ke double karne ki umeed kaafi tej ho gayi hai.

Rail News
15950 views
0

Aug 06 (23:22)
MrMultiTalented~
MrMultiTalented~   2497 blog posts
Re# 6102501-1              
Work has not started yet. It is a very sad that it will take another 10 yrs to start and another 20 yrs to complete. This is all about Indian Railway work culture. Need Privatization in Indian Railway for quality service.
Translate to English
Translate to Hindi
Rail News
79661 views
0

New Facilities/Technology
ER/Eastern
Jul 04 (23:53)   Munger-Khagaria Rail Line Doubling Approved: ₹1890 Crore Project to Boost Connectivity

AbhinavKr^~   159 news posts
Entry# 6114666   News Entry# 558978         Tags   Past Edits
Munger Khagaria Rail Line: डबल होगी मुंगेर-खगड़िया रेल लाइन, योजना पर खर्च होंगे 1890 करोड़ रुपये

The Indian Railways has approved the doubling of the 14 km long Jamalpur-Khagaria (Umesh Nagar) rail line in Bihar, costing approximately ₹1890 crores. The project aims to improve connectivity and provide a more efficient railway network by addressing congestion on the single track line. The doubling will extend from Jamalpur to...
more...
Umesh Nagar in the Khagaria direction, connecting to the Barauni-Katihar rail line. Additionally, a 7 km long bypass line from Ratanpur to Munger will also be doubled. This project is expected to improve train services between Munger and Bhagalpur. The project was approved in the recent budget, and a survey was conducted with ₹50 crore allocated for it. The doubling of the line and the bypass will be completed in stages, with the construction commencing soon.

Bihar mein, Jamalpur se Khagaria (Umesh Nagar) tak 14 km ki rail line ko double karne ka project approve ho gaya hai. Is project ke liye ₹1890 crore ka budget allocate kiya gaya hai. Isse rail network mein improvement aayega aur single track wali problem solve ho jaayegi. Yaani Jamalpur se...
more...
Khagaria direction mein Umesh Nagar tak line double ki jaayegi aur yeh line Barauni-Katihar rail line se connect hogi. Iske saath hi, Ratanpur se Munger tak 7 km ki bypass line ko bhi double kiya jaayega. Isse Munger aur Bhagalpur ke beech ki rail services improve ho jaayengi. Budget mein is project ko approve kiya gaya tha aur uske baad survey kiya gaya, jiske liye ₹50 crore allocate kiye gaye the. Ab is project par kaam jaldi hi start hoga.

Rail News
2451 views
0

Aug 06 (23:16)
MrMultiTalented~
MrMultiTalented~   2497 blog posts
Re# 6114666-1              
Very Good News.

But work should start very soon and also required to finish work on time.
Translate to English
Translate to Hindi

8 Public Posts - Tue Aug 06, 2024

3 Public Posts - Wed Aug 07, 2024
Rail News
27380 views
0

Aug 02 (11:22)   Overcrowding and Poor Maintenance Plague Jamalpur-Munger Passenger Train

SmallTownTraveller^~   5779 news posts
Entry# 6143666   News Entry# 563213         Tags   Past Edits
फिर 8 कोच वाली बन गयी है जमालपुर मुंगेर डेमू पैसेंजर ट्रेन, ठसाठस भीड़ से परेशानी

The Jamalpur-Munger rail line's passenger train, which runs between Jamalpur and Tilrath and Jamalpur and Khagaria, is experiencing overcrowding and a shortage of coaches. The train, which initially consisted of 10 coaches, has been reduced to 8 coaches, leading to discomfort for passengers. The train, a DEMU (Diesel Electric Multiple...
more...
Unit) has been in service since 2016 and its coaches are in a dilapidated condition, leading to demands for a replacement with an EMU (Electric Multiple Unit) with 12 coaches. Passengers are also concerned about the lack of ticket checking, which has been absent for the past 20 days. The train's lack of maintenance, particularly the faulty fans and lights, adds to the discomfort during the hot weather.

Jamalpur se Munger jaane wala rail line ka passenger train, jo Jamalpur aur Tilrath aur Jamalpur aur Khagaria ke beech chal raha hai, bahut zyada bheed aur coach ki kami se pareshan hai. Train, jo pehle 10 coach tha, ab 8 coach kar diya gaya hai, jisse yatriyon ko pareshani ho...
more...
rahi hai. Train, ek DEMU (Diesel Electric Multiple Unit) hai jo 2016 se chal raha hai aur uske coach bahut kharab halat mein hain, jisse ek EMU (Electric Multiple Unit) se badalne ki maang ho rahi hai, jo 12 coach wala ho. Yatri ticket check nahi hone se bhi pareshan hain, jo pichhle 20 din se nahi ho raha hai. Train ka saaf-sfai aur maintenance bhi bahut kharab hai, isme fan aur light kharab hain, jisse garam mausam mein bahut pareshani ho rahi hai.

Rail News
17494 views
0

Aug 06 (23:09)
MrMultiTalented~
MrMultiTalented~   2497 blog posts
Re# 6143666-1              
Need some Long distance train from Munger/Jamalpur and some passing train through Munger Rail bridge.
Translate to English
Translate to Hindi
Rail News
3923 views
0

IR Affairs
ER/Eastern
Aug 04 (20:04)   Eastern Railway's Solar Power Revolution Cuts Carbon Footprint

Exynos9611~   19445 news posts
Entry# 6146328   News Entry# 563620         Tags   Past Edits
Eastern Rail: অভাবনীয় কীর্তির অভূতপূর্ব নজির রেলের! জাতির স্বার্থে এহেন উদ্যোগের ভূয়সী প্রশংসা

Eastern Railway has successfully implemented solar power plants at its stations and workshops, significantly reducing carbon emissions and dependence on non-renewable energy sources. In the first quarter of 2023-24 (April-June), Eastern Railway generated a remarkable 61,45,079 kilowatt-hours of solar energy, a significant increase from the previous year's 26,80,003 kilowatt-hours. The...
more...
success is attributed to the efficient implementation of solar panels, contributing significantly to sustainable energy in the region. The Howrah, Sealdah, Asansol, and Malda divisions, along with the Liluah, Kanchrapara, and Jamalpur workshops have all contributed to this impressive output. The installation of new solar units has boosted energy capacity, with a total of 661617 kilowatt-hours of new solar units installed. This achievement represents 7.19% of the total energy consumption for 2024-25, showcasing Eastern Railway's commitment to sustainable energy solutions and environmental impact reduction. Eastern Railway's Chief Public Relations Officer, Kaushik Mitra, expressed pride in harnessing solar energy and its contribution to a brighter and greener future.

Eastern Railway ne apne stations aur workshops mein solar power plants lagake, carbon emission aur non-renewable energy sources pe dependancy kam kar diya hai. 2023-24 (April-June) ke pehle quarter mein, Eastern Railway ne 61,45,079 kilowatt-hours ki solar energy generate ki, jo ki pichle saal ke 26,80,003 kilowatt-hours se kaafi zyada hai....
more...
Ye success solar panels ke successful implementation ki wajah se possible hua, aur isne region mein sustainable energy mein bada contribution diya hai. Howrah, Sealdah, Asansol, aur Malda divisions, aur Liluah, Kanchrapara, aur Jamalpur workshops sabne is impressive output mein contribution kiya hai. New solar units lagne se energy capacity bhi badhi hai, aur total 661617 kilowatt-hours ki new solar units install ki gayi hai. Ye achievement 2024-25 ke total energy consumption ka 7.19% hai, aur yeh Eastern Railway ki sustainable energy solutions aur environmental impact reduction ke commitment ko show karta hai. Eastern Railway ke Chief Public Relations Officer, Kaushik Mitra, ne solar energy ko harness karne aur ek brighter aur greener future mein contribute karne pe pride express kiya.

Rail News
2560 views
0

Aug 06 (23:08)
MrMultiTalented~
MrMultiTalented~   2497 blog posts
Re# 6146328-1              
It is a good that carbon emission has decreased. Good work of Indian Railway.
Translate to English
Translate to Hindi
Rail News
28118 views
0

IR Affairs
ER/Eastern
May 03 (19:47)   Jamalpur Rail Workers Protest Increased Working Hours

AdittyaaSharma^~   73561 news posts
Entry# 6052065   News Entry# 550838         Tags   Past Edits
रेल इंजन कारखाना में 3 घंटा प्रति सप्ताह बढ़ाई गयी रेल कर्मियों के काम का समय

Railroad employees at the Jamalpur Rail Engine Factory will now work 48 hours per week, an increase from the previous 45 hours. This change was implemented on Thursday, April 29th, 2024, following a directive from the Railway Board. The new work schedule outlines specific working hours for different shifts, including morning,...
more...
staggered, and night shifts. The employees protested the change, calling it detrimental to their well-being, and submitted a memorandum to the Chief Factory Manager demanding its reversal.

Jamalpur Rail Engine Factory mein ab rail karmachariyon ko har hafta 48 ghante kaam karna hoga, pehle woh 45 ghante kaam karte the. Yeh badlaav 29 April 2024, Thursday ko Railway Board ke aadesh ke baad lagaa diya gaya. Naye kaam ke schedule mein har shift ke liye alag alag kaam...
more...
ke ghante bataye gaye hain, jaise morning, staggered, aur night shift. Karmachariyon ne is badlaav ka virodh kiya, use apne hit ke khilaf bataya, aur Chief Factory Manager ko ek memorandum submit kiya jismein is aadesh ko vapas lene ki maang ki gayi.

Rail News
16952 views
1

May 29 (17:26)
MrMultiTalented~
MrMultiTalented~   2497 blog posts
Re# 6052065-1              
Very Good. Railway ko optimum utilise karna chahiye apne work force ko bcoz huge salary to de hi rahi hai.
Translate to English
Translate to Hindi
Page#    732 Blog Entries  <<prev  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

2308508 ★★★ 36Yantravinyas
3090937 ★★★ 70KeepTravelling^~
2537064 ★★★ 65~
1959644 ★★★ 267Arpit~
3619297 ★★★ 400HBR^~
4948161 ★★★ 44SCoR~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy