Mahabodhi ka extension scenario aur infra pe depend karta hai. Total 2 case ho rahe hai.
Case 1) PM shift from ECR to ER.
Agar ECR Mahabodhi ka PM ER ko dena chahta...
more... hai to ER sabse pehle Bhagalpur me PM reject kardega kyoki BGP CDO me space boht kam hai aur 4th pit Amrit Bharat ke liye bani hai , usme electrification kiya hua hai . So Mahabodhi ER territory me Malda extension possible hai kyoki BGP se sabse nearest CDO Malda me hai aur waha space slot sab uplabdh hai. Jitne rake uplabdh hogi sab ka PM Malda me possible hai
Note: Just assumption
Case 2) PM shift from ECR to NR
Agar Mahabodhi ka PM Delhi shift hogya to Bhagalpur ke alawa boht option available hai. Dumka , Godda , Rampurhat , Azimganj, Jasidih/Madhupur , Asansol bhi ja sakti hai
Note: These are only assumption & I don't support extension of Mahabodhi express . I am sharing this as Railway Board has will to extend Mahabodhi
please wait...Translate to EnglishThe Mahabodhi extension scenario depends on the infrastructure and the extension plan. There are two possible cases:
**Case 1) PM shift from ECR to ER**
If ECR wants to give the PM of Mahabodhi to ER, then ER will first reject the PM at Bhagalpur because there is very little space at BGP CDO and the 4th pit was built for Amrit Bharat and is already electrified. So, a Mahabodhi extension in ER territory is possible in Malda, as it is the nearest CDO from BGP and has space and slots available. All available rakes can be accommodated in Malda.
Note: This is just an assumption.
**Case 2) PM shift from ECR to NR**
If the PM of Mahabodhi shifts to Delhi, there are many options available apart from Bhagalpur. It can go to Dumka, Godda, Rampurhat, Azimganj, Jasidih/Madhupur, and Asansol.
Note: These are just assumptions, and I do not support the extension of the Mahabodhi express. I am sharing this information because the Railway Board has expressed a desire to extend the Mahabodhi.