May be once TK-ASK is doubled, it will be speeded up, but many times i checked in NTES that its arriving 10mins early at UBL. Already it gets the highest priority in the whole section in both ways, so there may not be speed up after just Birur- Chikjajur section is doubled. Right now, only Hosadurga Rd- Chikjajur section is to be doubled between ASK- JRU.