Blog Entry# 1582617
Posted: Sep 05 2015 (08:30)
12 Responses
Last Response: Sep 14 2015 (09:57)
Experimental stoppage provided to trains at stations for a period of six months.
I was expecting 12577/78 Bagmati Superfast to get a halt at either Barh or Baktiyarpur