Bhai logo, I am travelling from Allahabad to Mughalsarai by magadh express. Towards the south end of tracks that means not towards gangs side, I am seeing that from karchana to mughalsarai, soil works and pool works is being done at various places. The breadth of the soil work lokks like two tracks is to be laid on it. If anyone having knowledge, kindly tell, whether parts of ald mgls section is being four lined or the construction work is part of eastern DFC?