1 JUL 2016: As like any other day Poorva was scheduled to have 5 overtakes from 12314/12306/22812/12310/12394. In my journey, it was a 3 point overtake (Overtaken at 3 different halts). First at DADRI (12314 Overtaken there), Second, Third and Fourth at Dankaur (12306 HR, BBS RAJ, ONBE RAJ Overtaken there) and Fifth at Mahrawal (Sampoorna Kranti Overtaken There).
Within halts Poorva was showing awesome aggression and sometimes even crossed 133kmph speed.
At the time of PNBE and SK, They came silently and i hence i missed out Locomotives of both :(...
more... Sorry For that.
(Video is trimmed at several areas to Convert a 25 mins long video into a compact minute long video. thus, you may feel that things are going suddenly after one, but it's all to save video time, and my data) :)