And still 15mins halt is not enough to complete all these steps right ?? Earlier when the halt was 15mins all the above mentioned steps were still performed within the stipulated time duration and now when still the halt is of same 15mins duration then why can't the all the conventional steps be applied ?
Then I must wish KGP halt should b withdrawn like in the case of Odisha SK and Utkal exp if possible but it will drastically reduce revenue and food loading at KGP ... but food loading can be done at BLS also as it too has a base kitchen though not inaugurated yet..
And...
more... I conclude that many people (who don't even have anything to do with BBS Raj and ECoR and KGP authorities) literally don't want this train to be hauled by P7