but that is the case at present. I believe railway is going ahead with redvelopment keeping the future requirement in mind and as of now all the trains are terminating trains but as as the GC of mhow khandwa completes and also completion of indb dahod both passenger and goods trafffic will increase significatnly. If this is taken up later then the cost for the same will increase so IMO it is a sensible move from railways