Marvelous job done by our American Engineers .Tipu s Armoury in Srirangapatna has been shifted as it is to the nearby location.So this shifting facilitates Bangalore to Mysore very long pending Doubling with Electrification .
More and more trains are shifted to Mysore from Bangalore and Yeswantpur and relieve the congestion in Bangalore area.
The travel time also reduced by 30 minutes for the most of the expresses.