CR should have doubled this daund - Gulbarga long back during 2003 - 2007.4 - 5 years of time could have been maximum for them to complete.Even we could have seen the trains running with electric end to end by now specially Mumbai Chennai.dont know why they gave least importance at that time during 2002 - 03.