To achieve this IR need to do :
1. Electrify all route either as double electric line or atleast as Single electric line
2. Increase production of eloco
3. Stop manufacturing of alco
4. Proper...
more... utilisation of available eloco's to all trains
5. Finally all the GC project must be assign efication as soon as successful CRS