Infact it was short terminated at KPD and not AJJ and same rake went back to SBC as 12609. If AJJ works are not completed by Sunday afternoon, you can expect the same pattern. Since rake belongs to SWR, if there is too much delay post KPD, 12609 will mostly depart from Sholingur or KPD or WJR. Mostly SR wont let it run till MAS with too much delay.