This is not exactly a third rail electrification. Typically in 'Third rail' systems, the current carrying conductor is at the rail level only, either running between the rails, or running between the tracks. The DMRC uses overhead electrification only, but uses a rigid catenary instead of the normal hanging wires for managing the tunnel sections.