CRS inspection of Kulshekar Cabin-Jokatte double line completed today. Trial run was done at 17:30. Couldn't see the train since I was stuck behind a long line of vehicles at the LC.
The details can now be updated as "double line" from Jokatte to Kulshekar Cabin(newly constructed near Kulshekar tunnel).
Mangaluru Junction to Kulshekar cabin will take another year or so since the tunnel work is still pending.