Thane se diva 5-6 line ka kaam kaafi fast chal Raha hai and yaha pe bhi jagah nahi hai so railway ne bridge banaya hai mumbra khadi ke kinare se bridge ban Gaye hai baaki new pf ban Gaye Mumbra kalva me and tracks ko bichane ka kaam bahut fast chal Raha hai Rahi baat Kurla CST ki to waha pe bahut congestion hai as jagah bilkul nahi hai as tracks ke was paas building hai so dekhte hai 5-6 line kese bante hai Kurla CST ke beech