On Trip
Late: 3m late
@ MDDP/Mandi Dip
Speed: 22 km/h
Goods line electrification in progress.
On Trip
Late: 10m late
ITKL/Itaya Kalan 3.3 km<--->4.9 km ODG/Obaidulla Ganj
Speed: 108 km/h
.
On Trip
Late: 4m late
HBD/Hoshangabad 6.7 km<--->2.7 km PRKD/Powarkheda
Speed: 105 km/h
.
How is the lunch offered by pantry in this one?