On Trip
Late: 1h 46m late
@ PFM/Phaphamau Junction
Speed: 12 km/h
doubling work in progress at PFM
Posted thru
Follow my TripOn Trip
Late: 1h 46m late
PFM/Phaphamau Junction 2.4 km<--->4.0 km PRG/Prayag Junction
Speed: 44 km/h
tracks laid on bridge
Posted thru
Follow my TripOn Trip
Late: 1h 34m late
@ PFMA/Pfm Byepass A Cabin
Speed: 4 km/h
doubling work in progress.. as well Y leg
Posted thru
Follow my TripOn Trip
Late: 1h 45m late
PFM/Phaphamau Junction 2.7 km<--->3.6 km PRG/Prayag Junction
Speed: 46 km/h
doubling work done over here
Posted thru
Follow my TripOn Trip
Late: 1h 46m late
PFM/Phaphamau Junction 5.0 km<--->1.3 km PRG/Prayag Junction
Speed: 24 km/h
doubling
Posted thru
Follow my Trip