Railways should not cancel the trains which are the only trains running in a section. Ill fated sgrl-bsb intercity cant cover 200 km in 8 hrs even biased controlling , dirty politics and syndicate is responsible for the poor treatment of this train. NCR, ECR, NR , local politicians all are responsible and people are suffering.