Is it confirmed that NDLS-BSB-HWH line will byepass PNBE and will now be going via SSM/GAYA.
There is no update from NHSRCL on their site, atleast I could not see any.But in wikipedia there are two conflicting articles:
1. In
click here
The...
more... Line is given as
NDLS-AGC-LKO-BSB-PNBE-DHN-ASN-KOAA
But in
2.
click hereIt is given to be routed by GAYA
I hope the original plan still survives because baring NDLS and KOAA there is probably not station that can give a compedition when it comes to patronage like PNBE can . Maybe LKO is there too. My point is makes no sense to divert it via GAYA since you have to construct a HSR from BSB to PNBE anyways because of the BSB-PNBE-GHY HSR line
Makes less sense IMO diverting via GAYA both patronage wise and infrastructure cost wise. Rather PNBE should be the JN for the BSB-GHY and BSB-KOAA lines.
agree or not?