Standardization done with ICF rake itself they should add a PC to this train too. And instead of idling the rake for 4 days at SVM/VSG should restart VSG MAS weekly with RSA.
It's already running with 2 AC three tier coaches on temporary basis as of now marked at BE1 and BE2. After temporary augmentation is over those two will be renamed as B5 and B6. No LHB here.