LHBfication of Visakha Exp has been postpone. to 19th jan 2023.
SCR must be planning to reduce the Running time by speeding up the train and making it a SF Exp.
It must be planning to cover the distance of 1135 km between SC and BBS in 20 hours 30 minutes.
It should be made to start at SC at...
more... 16.00 and reach BBS at 12.30 on the next day.
In the return journey it can start at BBS at 13.30 or 14.00 and reach SC at 10.00 or 10.30 .
If SCR wants to reduce the number of Rakes to 2 from the present 3 rakes, It should have RSA with Narayanadri or some other train.