Instead of ADI , NWR should run it between Ju and Delhi after electrification work gets finished.
The route should be via RGS , stops should be at GGN , RGS , Merta
This will surely do wonders afterwards.
route length is roughly 550 kms .. a VB train set can cover the same in 6.5-7 hours.
it...
more... is not getting much pax on ADI route....
please wait...Translate to EnglishInstead of ADI, NWR should run it between Ju and Delhi after electrification work is done. The route should go through RGS, with stops at GGN, RGS, Merta. This will definitely be amazing later on. The route is about 550 kms long and a VB train set can complete it in 6.5-7 hours. It's not attracting many passengers on the ADI route....