I had/have desire(s) for the following Intercity(ies),
#1 14221/22 AYC ⇌ CPA ICE to GWL via ETW when once ETW - GWL electrification was completed (cancelled currently) [last ran with 10 GEN coaches]
#2...
more... 14123/24 PBH ⇌ CNB ICE to BNDA [currently 13 GEN coaches]
#3 14204/03 LKO ⇌ BSB ICE from/to CNB (dep 0530) [currently 10 coaches]
#4 14210/09 LKO ⇌ PYGS ICE from/to CNB (dep 0600) [currently 14 coaches]
#5 14227/28 - 24227/28 BSB ⇌ LKO/CNB Varuna to BRT (cancelled currently) [last ran with 17 coaches]
#6 22442/41 CNB ⇌ PRYJ ICE to BSBS/BSB via GYN/BOY as per scope (acting as Reverse Varuna when it was not extended to CKTD) [currently 13 GEN coaches]
#7 02454/53 SRE ⇌ LJN ICE attach @ MB with link to 22454/53 MTC ⇌ LJN Rajya Rani [currently 13 coaches]
#8 21109/10 VGLJ ⇌ PRYJ ICE detach @ GOY with link to 11109/10 VGLJ ⇌ LJN ICE [currently 13 coaches]
#9 22180/79 FBD/MNQ ⇌ LJN ICE detach @ ETW with link to 12180/79 AF ⇌ LJN ICE [17 coaches, earlier it was ICF]
#10 14103/04 CNB ⇌ AGC ICE via BHA and 24103/04 CNB ⇌ GWL ICE via BIX detach @ UDMR (New Train CNB dep 0700) [remove PNKD, RURA, JJK, halts for 12419/20]
#11 24102/01 CNB ⇌ BE ICE detach @ ON with link to 14102/01 CNB ⇌ PYGS ICE [currently 13 GEN coaches]
#12 12531/32 GKP ⇌ LJN ICE to CNB [currently 20 coaches]
#13 15069/70 GKP ⇌ ASH ICE to CNB [currently 20 coaches]
#14 15081/81 GTNR ⇌ JEA(Gorakhpur) ICE from/to CNB (dep 0430) [currently 14 GEN coaches]
#15 14105/06 CNB ⇌ MLN ICE via STP in lieu of 15009/10 GKP ⇌ MLN Exp (for section LJN - STP - MLN only) (New Train)
[15009/10 GKP ⇌ MLN should be diverted to VGLJ after LJN/ASH to cater mumbai/South rush]
..... many more ;-)
Note : TTs will require re-adjustment, RSA needs to be re-evaluated/reconsidered, PM needs to be shifted, etc