Electrification Update:
So From Simaluguri to Dibrugarh via Sibsagar Town OHE Pole Positioning is Complete now Other Equipments are to be Installed then OHE Wires, Wire Holders etc will be Installed Soon we will See Electric wires + Diesel Locos chugging till Electric Locomotives Start Running.
Credit: Vicky Kunwar
Date: 30 November 2023