Instead of idling for 35 - 50 odd minutes at DLJ and running with different numbers, BVC - DLJ and MHV - DLJ passengers should be merged into a single train BVC - MHV passenger.
Also, it looks like 2 or more than 2 rakes are required to operate this pass as one BVC - JLR and BVC - SUNR are also sharing the rake.