Metro In Indore: इंदौर में अनलोड हुआ चौथा कोच सेट, डिपो में मेट्रो की कतारThree coaches of the fourth set of Indore's Metro train arrived at the Gandhi Nagar Depot on Wednesday. They were unloaded from a trailer using a special crane and placed on the tracks in the depot. The three coaches were then linked together and moved to the inspection yard. ...
more... Currently, three coaches are being inspected on the 900-meter test track in the depot. A total of 25 sets of coaches will be used for Metro operations in Indore. Four sets have already arrived at the Gandhi Nagar Depot, and another set is expected to arrive by the end of this month. These coaches will operate on the 5.9 kilometer Priority Corridor from Gandhi Nagar Station to TSS. The New Development Bank has provided a loan of ₹1600 crore for the construction of the Metro's elevated corridor. The Metro Rail Corporation has also received ₹1600 crore from the Asian Development Bank for the construction of the underground section, which will extend 8.8 kilometers from Regal Square to the airport and include seven stations. Tenders have already been issued for the construction of this section.
Indore ke Metro train ka chautha set, Wednesday ko Gandhi Nagar Depot par aa gaya. Trailer se special crane se unload karke, depot ke track par rakha gaya. Teen coaches ko aapas mein jodkar, inspection yard mein le jaaya gaya. Abhi, inspection yard mein teen coaches pe 900...
more... meter ke testing track par check kiya ja raha hai. Indore mein Metro chalne ke liye 25 sets use honge. Gandhi Nagar Depot par chaar sets pahunch chuke hai, aur is mahine ke end tak, ek aur set aane ki ummid hai. Ye coaches 5.9 kilometer ke Priority Corridor par, Gandhi Nagar Station se TSS tak chalenge. Metro ke elevated corridor ke liye, New Development Bank se 1600 crore rupees ka loan mil gaya hai. Metro Rail Corporation ko Asian Development Bank se 1600 crore rupees bhi mile hain, jo Regal Square se airport tak 8.8 kilometer ke underground section ko banane ke liye use honge. Is section mein 7 stations banenge. Is section ke construction ke liye tenders bhi jaari kar diye gaye hain.