Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 14 19:18:53 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5988213
Posted: Mar 06 (12:47)

1 Responses
Last Response: Mar 06 (19:23)
Rail News
7506 views
0

Metro
UPMRC/Lucknow Metro
Mar 06 (12:47)   Lucknow Metro's East-West Corridor Construction Approved, Connecting Charbagh to Vasant Kunj

AdittyaaSharma^~   73345 news posts
Entry# 5988213   News Entry# 543983         Tags   Past Edits
लखनऊ मेट्रो के नए कॉरिडोर में होंगे ये 12 स्टेशन, निर्माण का रास्ता साफ

The construction of the East-West corridor of the Lucknow Metro from Charbagh to Vasant Kunj has been cleared. This new corridor will include 12 stations and has been approved by the state government. The project will be sent to the central government for approval, and once approved, tenders for construction and...
more...
other work will begin. The 11.165 km long corridor will cost approximately ₹5,801 crore and connect busy areas like Aminabad, Pandeyganj, Medical College, and Chowk. This corridor will be called the Blue Line and is expected to be completed by June 23, 2027. The state government had previously asked the Uttar Pradesh Metro Rail Corporation (UPMRC) to revise the DPR (Detailed Project Report) by reducing the number of metro coaches and shortening the stations, which was then submitted in 2019. The corridor will have 5 elevated stations and 7 underground stations. The depot for the East-West corridor will be constructed in Vasant Kunj. The Charbagh metro station will serve as a junction point, connecting the North-South and East-West corridors. This means that people arriving from the airport who wish to travel to Aminabad, Chowk, Medical College, or Vasant Kunj will need to change trains at Charbagh.

Lucknow ke Charbagh se Vasant Kunj tak metro ka East-West corridor banne ka rasta saaf ho gaya hai. Is new corridor mein 12 stations honge aur state government ne isko approve kar diya hai. Project ab central government ko approval ke liye bheja jaayega, aur approve hone ke baad construction aur...
more...
other kaam ke tenders start honge. 11.165 kilometer lamba ye corridor lag bhaag ₹5,801 crore ka kharcha karega aur Aminabad, Pandeyganj, Medical College, aur Chowk jaise busy areas ko jodta hai. Is corridor ko Blue Line ka naam diya gaya hai aur yeh June 23, 2027 tak complete ho jaayega. State government ne pehle UP Metro Rail Corporation (UPMRC) se DPR (Detailed Project Report) ko revise karne ko kaha tha, metro coaches ki sankhya ghata kar aur stations ko chhota karke, jisko fir 2019 mein submit kiya gaya tha. Corridor mein 5 elevated stations aur 7 underground stations honge. East-West corridor ka depot Vasant Kunj mein banta hai. Charbagh metro station ek junction point hoga, jahan North-South aur East-West corridor milte hain. Iska matlab hai ki airport se aane wala log jinhe Aminabad, Chowk, Medical College, ya Vasant Kunj jaana hai, unhe Charbagh pe train badalni padegi.

Rail News
4129 views
0

Mar 06 (19:23)
mksawan07
mksawan07   57 blog posts
Re# 5988213-1              
Lucknow metro extension ko janbujhkr delay Kiya Gaya
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6186432 ★★★ 42PankajMishra^~
4402199 ★★★ 264AvishekRay~
4387942 ★★★ 61AvishekRay~
6186110  11Rail_0326~
5955786 ★★★ 51fanof12801~
6177596 ★★ 29KeepTravelling^~
3368675 ★★★ 393mr.train_wala~
6007860 ★★★ 113RailwayFiles~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy