I was thinking the same thing, well if they do it probably they will have to resume the pre-covid trains and run existing ones with 22 Coaches. So, in the name of 2nd Pitline which can handle 22 Coaches they are playing with it and not giving it clearance. If they really wanted they would've have commissioned 2nd Pitline long back and with that they would have extended 1st Pitline as well. But the needle doesn't point towards passenger trains for SWR.