Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 14 09:30:12 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6012185
Posted: Mar 28 (20:59)

No Responses Yet
Rail News
92571 views
0

IR Affairs
SWR/South Western
Mar 28 (20:59)   Train Service Updates: Several Trains to Continue as Scheduled, While Others Face Partial Cancellations

Exynos9611~   19232 news posts
Entry# 6012185   News Entry# 546384         Tags   Past Edits
There is no change in timetable of Vijayapura-Mangaluru, Guntakal-Hubballi trains, says South Western Railway

South Western Railway has announced that several train services will continue as scheduled, despite earlier notifications of their withdrawal or cancellation. This includes the Vijayapura-Mangaluru Jn-Vijayapura Daily Express Special, Guntakal-SSS Hubballi Daily Passenger Special, and Kabakaputtur-Mangaluru Central Special trains. The Vijayapura-Mangaluru Junction train will continue with its existing days of service,...
more...
composition, and fare structure.However, some trains will have partial cancellations due to ongoing construction projects. The CSMT Mumbai-Hosapete Superfast Express will terminate at Koppal instead of Hosapete, while the Hosapete-CSMT Mumbai Superfast Express will originate from Koppal instead of Hosapete.Other temporary changes include a one-minute stoppage for the Yesvantpur-Bikaner-Yesvantpur Bi-weekly Express at Birur, and a one-minute stoppage for the Belagavi-Mysuru-Belagavi Vishwamanava Daily Express and the KSR Bengaluru-SSS Hubballi-KSR Bengaluru Daily Express at Ramagiri.South Central Railway will continue operating the Narasapur–Sir M. Visvesvaraya Terminal Bengaluru-Narasapur Special Express due to increased demand during the summer season. This service will run every Friday and Saturday until April 26 and 27, respectively.The partial cancellation of Train Nos 07589 and 07590 due to ongoing yard modification works at Kadiridevarapalli is extended until April 30 and May 1, respectively.Finally, the partial cancellation of Train Nos 17333 and 17334 due to doubling and safety-related works at Tinai Ghat Station Yard is extended until April 30.

South Western Railway ne announce kiya hai ki kai train services, jo pehle withdraw ya cancel hone wali thi, woh apne schedule ke mutabiq chalti rahengi. Isme Vijayapura-Mangaluru Jn-Vijayapura Daily Express Special, Guntakal-SSS Hubballi Daily Passenger Special, aur Kabakaputtur-Mangaluru Central Special trains shamil hain. Vijayapura-Mangaluru Junction train apne existing days of...
more...
service, composition, aur fare structure ke saath chalti rahegi.Lekin kuchh trains mein partial cancellation hone wali hai, kyunki construction projects chal rahe hain. CSMT Mumbai-Hosapete Superfast Express Hosapete ki jagah Koppal pe terminate karegi, aur Hosapete-CSMT Mumbai Superfast Express Hosapete ki jagah Koppal se originate karegi.Dusre temporary changes mein Yesvantpur-Bikaner-Yesvantpur Bi-weekly Express ka Birur pe ek minute ka stoppage hai, aur Belagavi-Mysuru-Belagavi Vishwamanava Daily Express aur KSR Bengaluru-SSS Hubballi-KSR Bengaluru Daily Express ka Ramagiri pe ek minute ka stoppage hai.South Central Railway summer season mein zyada rush ke wajah se Narasapur–Sir M. Visvesvaraya Terminal Bengaluru-Narasapur Special Express chalana jari rakhega. Yeh service har Friday aur Saturday, April 26 aur 27 tak chalti rahegi.Kadiridevarapalli mein chal rahe yard modification works ke wajah se Train Nos 07589 aur 07590 ka partial cancellation, April 30 aur May 1 tak badha diya gaya hai.Aakhir mein, Tinai Ghat Station Yard mein chal rahe doubling aur safety-related works ki wajah se Train Nos 17333 aur 17334 ka partial cancellation, April 30 tak badha diya gaya hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6186110  11Rail_0326~
5955786 ★★★ 51fanof12801~
6177596 ★★ 29KeepTravelling^~
6186432 ★★★ 41PankajMishra^~
3368675 ★★★ 393mr.train_wala~
6007860 ★★★ 113RailwayFiles~
3619297 ★★★ 396HBR^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy