Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Sep 15 09:14:02 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6017224
Posted: Apr 02 (20:41)

No Responses Yet
Rail News
2627 views
0

IR Affairs
SCR/South Central
Apr 02 (20:41)   South Central Railway Sets New Track Record with 416 km Addition

Exynos9611~   19290 news posts
Entry# 6017224   News Entry# 546949         Tags   Past Edits
SCR does a record 416 km of new track construction in 2023-24

South Central Railway (SCR) has achieved a record-breaking performance in the financial year 2023-24, adding 416 km of track. This includes 39 km of new lines, 54 km of gauge conversion, 133 km of double lines, and 190 km of third line works. The new lines include 11 km between Duddeda...
more...
and Siddipet (Telangana) and 28 km between Gundlakamma and Darsi (Andhra Pradesh). The gauge conversion project saw the completion of 54 km between Amlakhurd and Khandwa (Madhya Pradesh). The doubling project saw progress across various sections in Andhra Pradesh and Telangana, totaling 133 km. The third line projects saw the completion of 53 km, 60 km, and 77 km in various sections across Telangana and Andhra Pradesh. These achievements will enhance train operations and benefit rail passengers.

South Central Railway (SCR) ne financial year 2023-24 mein ek record breaking performance achieve kiya hai, jisme unhone 416 km track add kiya hai. Isme 39 km new lines, 54 km gauge conversion, 133 km double lines aur 190 km third line works shamil hai. New lines mein 11 km Duddeda...
more...
aur Siddipet (Telangana) ke beech aur 28 km Gundlakamma aur Darsi (Andhra Pradesh) ke beech hai. Gauge conversion project mein Amlakhurd aur Khandwa (Madhya Pradesh) ke beech 54 km complete hua hai. Doubling project mein Andhra Pradesh aur Telangana ke different sections mein 133 km ka progress hua hai. Third line projects mein Telangana aur Andhra Pradesh ke different sections mein 53 km, 60 km aur 77 km complete hua hai. Yeh achievements train operations ko enhance karenge aur rail passengers ko benefit denge.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6186110  12Rail_0326~
6186432 ★★★ 43PankajMishra^~
4402199 ★★★ 264AvishekRay~
4387942 ★★★ 61AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy