आदित्यपुर में लाइन सरेंडर कर बन रहा फुट ओवरब्रिजThe Chakradharpur division of the Indian Railways is focusing on expanding the yard at Adityapur station to improve passenger amenities and train operations. The expansion includes platform extension, construction of a foot overbridge (FOB), and a loop line to ease operational constraints. The aim is to complete all construction by May...
more... 2024. To address potential disruptions caused by the station redevelopment project in Tatanagar, Adityapur is being planned as an alternate terminal station. Some trains might be operated from Adityapur instead of Tatanagar to mitigate passenger inconvenience. Additionally, a wall along the line from Adityapur to Gamharia is under construction to enhance safety and prevent trespass, facilitate faster train movement, and curb theft from the yard.
Adityapur station pe passenger facility aur train operation ko improve karne ke liye, Chakradharpur division yard ko expand karne pe focus kar raha hai. Isme platform ko badaa karna, foot overbridge (FOB) banaana aur train operation ko smooth karne ke liye loop line banaya ja raha hai. Sabhi kaam May...
more... 2024 tak complete hone ka target hai. Tatanagar station pe redevelopment kaam shuru hone se train operation mein dikkat aane ke possibility ko dekhte hue, Adityapur ko alternate terminal station banaya ja raha hai. Kuch trains ko Tatanagar ke bajaye Adityapur se operate kiya ja sakta hai, isse passenger ko inconvenience se bachaya ja sakega. Safety ke liye Adityapur se Gamharia tak line ke kinare wall banayi ja rahi hai, yeh trespass ko rokne, train ko tez chalane mein madad karega aur yard se chori ko bhi rokne mein help karega.