Blog Entry# 6065001
Posted: May 15 (19:53)
No Responses Yet
प्लेटफार्म A1 के रेलवे ट्रैक का काम पूरा:किशनगंज रेलवे स्टेशन पर डीजल इंजन का ट्रायल भी हुआ, जल्द चलेंगी ट्रेनेंThe new platform A1 at Kishanganj railway station has been completed with the railway track and a diesel engine trial has been conducted. However, electric engine operation on this track will take some time due to incomplete overhead equipment. Electric engine operation on the new railway track is expected to...
more... begin soon.
Kishanganj railway station pe naya platform A1 ke railway track ka kaam pura ho gaya hai aur diesel engine ka trial bhi ho chuka hai. Par, is railway track pe electric engine chalana shuru hone mein thoda time lagega kyunki overhead equipment abhi pura nahin hua hai. Naye railway...
more... track pe electric engine chalana jaldi hi shuru ho jayega.