Pitlines in various Coaching Depots in North East Frontier Railway Railway Zone:
1. Guwahati Coaching Depot - 3 Pitlines
• Pitline-1 21 ICF/19 LHB
• Pitline-2 20 ICF/19 LHB
•...
more... Pitline-3 19 ICF/18 LHB
2. Guwahati New Coaching Depot - 1 Pitline
• Pitline-1 25 ICF/23 LHB
3. Kamakhya Coaching Depot - 2 Pitlines
• Pitline-1 25 ICF/24 LHB
• Pitline-2 25 ICF/24 LHB
4. Katihar Coaching Depot - 4 Pitlines
• Pitline-1 535m 24 ICF/22 LHB
• Pitline-2 500m 22 ICF/20 LHB
• Pitline-3 457m 20 ICF/18 LHB
• Pitline-4 580m 25 ICF/23 LHB (Under Construction)
5. New Jalpaiguri Coaching Depot - 2 Pitlines
• Pitline-1 626m 28 ICF/26 LHB
• Pitline-2 403 18 ICF/16 LHB
6. KishanGanj Coaching Depot - 1 Pitline
• Pitline-1 535m 24 ICF/22 LHB
7.Balutghat Coaching Depot - 1 Pitline
• Pitline-1 560m 24 ICF/22 LHB
8. Silchar Coaching Depot - 2 Pitlines
• Pitline-1 560m 24 ICF/22 LHB
• Pitline-2 560m 22 ICF/22 LHB
9. Agartala Coaching Depot - 2 Pitlines
• Pitline-1 552 m 24 ICF/22 LHB
• Pitline-2 552 m 24 ICF/22 LHB
10. Dibrugarh Coaching Depot - 4 Pitlines
• Pitline-1 600 26 ICF/24 LHB
• Pitline-2 600 26 ICF/24 LHB
• Pitline-3 600 26 ICF/24 LHB
• Pitline-4 600 26 ICF/24 LHB (Under Construction)
11. Tinsukia Coaching Depot - 1 Pitline
• Pitline-1 535m 22 ICF/20 LHB
12. Naharlagun Coaching Depot - 1 Pitline
• Pitline-1 542m 24 ICF/22 LHB
13. Rangapara North Coaching Depot - 1 Pitline
• Pitline-1 580m 26 ICF/24 LHB
14. New Bongaigaon Coaching Depot - 1 Pitline
• Pitline-1 17 ICF Coaches
15. Alipurduar Coaching Depot - 1 Pitline
• Pitline-1 600m 26 ICF/24 LHB
Source: RTI filed by me
please wait...Translate to EnglishYo, check this out - the different coaching depots in the North East Frontier Railway Railway Zone got these pitlines:
1. Guwahati Coaching Depot - 3 Pitlines:
- Pitline-1: 21 ICF/19 LHB
- Pitline-2: 20 ICF/19 LHB
- Pitline-3: 19 ICF/18 LHB
2. Guwahati New Coaching Depot - 1 Pitline:
- Pitline-1: 25 ICF/23 LHB
3. Kamakhya Coaching Depot - 2 Pitlines:
- Pitline-1: 25 ICF/24 LHB
- Pitline-2: 25 ICF/24 LHB
4. Katihar Coaching Depot - 4 Pitlines:
- Pitline-1: 535m 24 ICF/22 LHB
- Pitline-2: 500m 22 ICF/20 LHB
- Pitline-3: 457m 20 ICF/18 LHB
- Pitline-4: 580m 25 ICF/23 LHB (still in the works)
And it goes on like that for a total of 15 coaching depots listed. Cool info, right? 😎