Why the SR can't operate the proposed train the timings of 06042? If it done, then it could have been a perfect overnight train. Only problem is time impact with rameswaram tirupathi triweekly. But slight time changes won't affect this much bigger.
Moreover the RSA of Amritha can also be done at Rameswaram by using this train's rakes.