डेढ़ घंटे का ब्लॉक रेलवे पुल पर पटरियां की दुरूस्तTo repair the uneven tracks on the railway bridge, a 1.5-hour block was taken. During this time, all the problematic tracks were removed and replaced with new ones. The repair work was carried out on the down line of the railway bridge from 3:10 PM to 4:40 PM. The rail operations...
more... on the down line were affected during this period. Railway staff removed the damaged tracks and replaced them with new ones. After the block period ended, operations resumed as usual.
Railway bridge pe tedhi-medhi patariyo ko durust karne ke liye, 1.5 ghante ka block liya gaya. Is duration mein, jahan bhi patariyan gadbad dikhti thi, unhe hata kar dusri lagayi gayi. Dopahar 03:10 baje se sham 04:40 baje tak block lekar railway bridge ki down line par patariyo ki marammat ka...
more... kaam kiya gaya. Kaam ke chalte, down line ka rail sanchalan prabhavit raha. Is time, rail karmiyon ne kharab patariyo ko hata kar, uske sthann pe nai patariyan lagayi. Block avdhi sampt hone ke baad, sanchalan normal ho saka.