Assam: Double line section commissioned between Barpeta Rd and Pathsala Indian Railways records the highest freight loading in May Cintra acquires part of IRB Infrastructure Trust, MMK Toll Road ATA says taxation issues pose hurdles for foreign airlinesThe Chief Commissioner of Railway Safety inspected the newly laid double line section between Barpeta Road and Pathsala stations in Assam, India, on June 2 and 3. The inspection was part of the 142.97 km long doubling project on the New Bongaigaon-Agthori via Rangiya route. The project includes 75 major bridges,...
more... 38 minor bridges, and 19 new station buildings. The inspected section, 21.40 km long, includes 16 major bridges and 5 level crossings. The second line was commissioned along with electrification. The inspection focused on safety, security, and operational efficiency, with particular attention paid to bridges, track fittings, level crossings, and signaling systems. Enhancements to passenger amenities included new foot over bridges at Sarupeta, Guagacha, and Barpeta Road stations, new platform sheds, and additional toilets at Sarupeta, Guagacha, and Barpeta Road stations.
June 2 aur 3 ko, Chief Commissioner of Railway Safety ne Barpeta Road aur Pathsala stations ke beech mein naya banaya gaya double line section ka inspection kiya. Yeh inspection New Bongaigaon-Agthori via Rangiya route par 142.97 km lamba doubling project ka hissa tha. Is project mein 75 major bridges, 38...
more... minor bridges aur 19 new station buildings bhi banaye gaye hain. 21.40 km lamba yeh section mein 16 major bridges aur 5 level crossings bhi hain. Dusra line electrify karke commission kiya gaya. Inspection mein safety, security aur operational efficiency pe dhyaan diya gaya, aur bridges, track fittings, level crossings, aur signalling systems ko check kiya gaya. Passenger amenities ko behtar banane ke liye Sarupeta, Guagacha, aur Barpeta Road stations pe new foot over bridges, platform sheds, aur toilets banaye gaye.