Disadvantage of weekly train..
On 15th May, this train was running late by 15mins, and Bihar SK was also late by 25min and was just behind it.
It was Jaswant Nagar, this train was taken in loop line, and Bsk was allowed to pass, though this train is also a fast train with aggressive run, it also had to run non stop till CNB like BSK.