Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Oct 7 07:49:51 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5963041
Posted: Feb 06 (20:23)

No Responses Yet
Rail News
2192 views
0

Rail Budget
Feb 06 (20:23)   Indian Government Allocates Budget for Railway Development in Ajmer Division

Exynos9611~   20975 news posts
Entry# 5963041         Tags   Past Edits
राजस्थान में बिछेंगी नई रेल लाइनें तो ये लाइन होंगी डबल, मोदी सरकार ने दी ये सौगात

The Indian government has allocated budget for the Ajmer division in the financial year 2024-25 for new railway lines and Railway Under Bridges (RUB). This will strengthen the railway lines in the division by carrying out doubling, gauge conversion, and other works. The allocated amounts are: Rs. 50 crore for Ajmer-Kota...
more...
(Nasiराबाद-Jalindri) section (145 km), Rs. 50 crore for Pushkar-Medta section (59 km), Rs. 100 crore for Ajmer (Nasiराबाद)-Sawai Madhopur via Tonk section (165 km), Rs. 2 crore for Bangar Gram-Ras section (27.8 km), Rs. 150 crore for Ratlam-Dungarpur via Banswara section (176.47 km), Rs. 300 crore for Tiranga Hill-Abu Road via Ambaji section (89.38 km), and Rs. 100 crore for Neemuch-Badi Sadi section (48 km). In addition to these, funds have also been allocated for electrification of some railway lines in Rajasthan, including the Bangar Gram-Ras section and Ras-Cement Siding (Rs. 1.5 crore), Nathdwara Town new line electrification (Rs. 4.175 crore), upgrade work on the Bhinwalia-Palanpur section (Rs. 37.25 crore), upgrade work on the Chittorgarh-Udaipur section (Rs. 17.74 crore), an A-category accident relief train for Udaipur City-Badi line (Rs. 10 lakh), construction of a two-lane road over bridge in place of level crossing number 132 on the Madar-Palanpur section (Rs. 5 crore), construction of two-lane road over bridges in place of 7 different level crossings on the Madar-Palanpur section (Rs. 6 crore), construction of four-lane road over bridges in place of 3 different level crossings on the Madar-Palanpur section (Rs. 5 crore), construction of underpasses in place of 43 different level crossings on the Rani-Keshavganj and Swaroopganj-Palanpur sections (Rs. 10 lakh), construction of underpasses in place of 52 different level crossings on the Udaipur-Himmatnagar section (Rs. 5 crore), construction of underpasses in place of 65 different level crossings on the Ajmer division (Rs. 10 crore), and construction of underground subways and road over bridges in place of 6 different level crossings on the Ajmer division. The budget for broad gauge work in Rajasthan includes Rs. 50 crore for the Ajmer-Chittorgarh-Udaipur section (300 km) and its extension to Umra (11 km) and basic modification work on the Mavli-Badi Sadi section (82.08 km), Rs. 75 crore for the Marwad-Mavli section (152 km), Rs. 1 crore for patch doubling on the Abu Road-Sarothra Road section (23.12 km), Rs. 1 crore for patch work on the Swaroopganj-Abu Road section (25.36 km), Rs. 1 crore for patch work on the Sarothra Road-Karjoda section (23.59 km), Rs. 10 lakh for the Rani-Keshavganj section (59.5 km), Rs. 1 crore for the Ajmer-Bangar Gram section (48.43 km), Rs. 5 lakh for the Gudiya-Marwad section (43.5 km) and the Karjoda-Palanpur section (5.4 km), Rs. 1 crore for patch work on the Bangar Gram-Gudiya section (47 km), Rs. 2.97 lakh for patch work on the Rani-Marwad Junction section (54.5 km), and Rs. 105 crore for the Ajmer-Chittorgarh section (186 km).

Indian government ne financial year 2024-25 ke liye Ajmer division ke liye new railway lines aur Railway Under Bridges (RUB) ke liye budget allocate kiya hai. Isse Ajmer division me railway lines ka sudridhkar, doubling, gauge conversion aur other works ho payenge. Allocate kiya gaya amount hai: Ajmer-Kota (Nasiराबाद-Jalindri) section (145...
more...
km) ke liye Rs. 50 crore, Pushkar-Medta section (59 km) ke liye Rs. 50 crore, Ajmer (Nasiराबाद)-Sawai Madhopur via Tonk section (165 km) ke liye Rs. 100 crore, Bangar Gram-Ras section (27.8 km) ke liye Rs. 2 crore, Ratlam-Dungarpur via Banswara section (176.47 km) ke liye Rs. 150 crore, Tiranga Hill-Abu Road via Ambaji section (89.38 km) ke liye Rs. 300 crore, aur Neemuch-Badi Sadi section (48 km) ke liye Rs. 100 crore. Iske alawa, Rajasthan me kuch railway lines ke electrification ke liye bhi funds allocate kiye gaye hain, jisme Bangar Gram-Ras section aur Ras-Cement Siding (Rs. 1.5 crore), Nathdwara Town new line electrification (Rs. 4.175 crore), Bhinwalia-Palanpur section par upgrade kaam (Rs. 37.25 crore), Chittorgarh-Udaipur section par upgrade kaam (Rs. 17.74 crore), Udaipur City-Badi line ke liye A-category accident relief train (Rs. 10 lakh), Madar-Palanpur section par level crossing number 132 ki jagah two-lane road over bridge banana (Rs. 5 crore), Madar-Palanpur section par 7 different level crossings ki jagah two-lane road over bridges banana (Rs. 6 crore), Madar-Palanpur section par 3 different level crossings ki jagah four-lane road over bridges banana (Rs. 5 crore), Rani-Keshavganj aur Swaroopganj-Palanpur sections par 43 different level crossings ki jagah underpasses banana (Rs. 10 lakh), Udaipur-Himmatnagar section par 52 different level crossings ki jagah underpasses banana (Rs. 5 crore), Ajmer division par 65 different level crossings ki jagah underpasses banana (Rs. 10 crore), aur Ajmer division par 6 different level crossings ki jagah underground subways aur road over bridges banana. Rajasthan me broad gauge work ke liye budget me Ajmer-Chittorgarh-Udaipur section (300 km) aur iska Umra (11 km) tak extension aur Mavli-Badi Sadi section (82.08 km) par basic modification kaam ke liye Rs. 50 crore, Marwad-Mavli section (152 km) ke liye Rs. 75 crore, Abu Road-Sarothra Road section (23.12 km) par patch doubling ke liye Rs. 1 crore, Swaroopganj-Abu Road section (25.36 km) par patch kaam ke liye Rs. 1 crore, Sarothra Road-Karjoda section (23.59 km) par patch kaam ke liye Rs. 1 crore, Rani-Keshavganj section (59.5 km) ke liye Rs. 10 lakh, Ajmer-Bangar Gram section (48.43 km) ke liye Rs. 1 crore, Gudiya-Marwad section (43.5 km) aur Karjoda-Palanpur section (5.4 km) ke liye Rs. 5 lakh, Bangar Gram-Gudiya section (47 km) par patch kaam ke liye Rs. 1 crore, Rani-Marwad Junction section (54.5 km) par patch kaam ke liye Rs. 2.97 lakh, aur Ajmer-Chittorgarh section (186 km) ke liye Rs. 105 crore include hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy