बीबीगंज गुमटी पर चेक रेल परिवर्तन व ओवरहॉलिंग का हुआ कार्य, आवागमन ठपOn Monday, track repairs were conducted at BB Ganj Crossing No. 2 on the Muzaffarpur-Ramdayalunagar section. The work, originally scheduled for Sunday, was delayed due to technical reasons. Besides track repair, the work included sleeper replacement, check rail changes, and overhauling. However, the ballast on the down line was not leveled,...
more... causing inconvenience to commuters. Local residents had to travel through Bhagwanpur, Gobarsahi, or Brahmpura to reach the city.
Monday ko, Muzaffarpur-Ramdayalunagar section ke BB Ganj Crossing No. 2 pe rail path ki marammat ka kaam kiya gaya. Yeh kaam Sunday ko hona tha, lekin technical reason ki wajah se shuru nahi ho paya tha. Monday ko, track marammat ke alawa, sleeper badalne, check rail change aur overhauling ka kaam...
more... bhi kiya gaya. Lekin, down line pe gitti ko railkarmio ne samatal nahi kiya hai. Isse aane-jane walon ki pareshani badh gayi hai. Local logon ko Bhagwanpur, Gobarsahi ya Brahmpura ho kar city ki taraf nikalna pada.