Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 20 20:09:10 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6048215
Posted: Apr 29 (23:45)

No Responses Yet
Rail News
18501 views
0

IR Affairs
ECR/East Central
Apr 29 (23:45)   DRM Inspects Muzaffarpur-Raxaul Railway Line, Emphasizes Timely Completion of Station Redevelopment Project

AdittyaaSharma^~   73768 news posts
Entry# 6048215         Tags   Past Edits
स्टेशन पुनर्विकास में लाएं तेजी: डीआरएम

On Monday, Divisional Railway Manager Vinay Shrivastav inspected the Muzaffarpur-Raxaul railway line. He inspected the washing pit under construction at Jiwdhara station and instructed the Chief Engineer of the construction agency to expedite the work. After Jiwdhara, the DRM arrived at Bapudham Motihari railway station via a special train. He reviewed...
more...
the station redevelopment project and checked the drinking water and canteen facilities. He expressed satisfaction with the availability of drinking water at Motihari station. During the review of the station redevelopment project in the new PMS office, he instructed the construction company to expedite the work, emphasizing that the station development work must be completed within the scheduled time and with quality. He directed the departmental engineers to resolve issues raised by the construction agency and consultancy officials. He instructed the UTS and PRS to be shifted to the new building by Wednesday. He asked the construction agency officials to speed up the work after shifting by setting up barricades. The DRM stated that the design for the light ROB at MS College Gumti has been approved and instructed the construction agency to begin work. He ordered the commencement of construction of railway quarters and offices. He also directed the installation of ACs in the station master panel room, ladies waiting room, and first-class waiting room. The station superintendent Dilip Kumar, commercial superintendent Ajay Kumar, SSE Amrendra Kumar, Rajiv Kumar, Ashutosh Jha, DCI Harikishor Bhakta, AEN Akhilesh Mishra, and other railway officials were present during the inspection.

Monday ko, Divisional Railway Manager Vinay Shrivastav ne Muzaffarpur-Raxaul railway line ka inspection kiya. Unhone Jiwdhara station par ban rahe washing pit ka inspection kiya aur construction agency ke Chief Engineer ko kaam mein tezi laane ka nirdhesh diya. Jiwdhara ke baad, DRM special train se Bapudham Motihari railway station pahunche....
more...
Wahin unhone station redevelopment project ki review ki aur peene ke pani aur janta khana ka jaayza liya. Motihari station par peeyajal ki uplabdhta par unhone santosh vyakt kiya. Naye PMS office mein station redevelopment project ki review ke dauraan, unhone construction company ko kaam mein tezi laane ka nirdhesh diya, yeh bhi emphasize karte hue ki station development ka kaam time par aur quality ke saath ho. Unhone departmental engineers ko construction agency aur consultancy officials dwara uthaye gaye issues ko resolve karne ka aadesh diya. Unhone UTS aur PRS ko Wednesday tak naye building mein shift karne ka nirdhesh diya. Unhone construction agency officials se kaha ki shifting ke baad barricade laga kar kaam mein tezi laaye. DRM ne kaha ki MS College Gumti par light ROB ka design approve ho chuka hai aur construction agency ko kaam shuru karne ka nirdhesh diya. Unhone railway quarter aur office ka nirman shuru karne ka aadesh diya. Unhone station master panel room, ladies waiting room, aur first-class waiting room mein AC lagaane ka bhi aadesh diya. Inspection ke dauraan station superintendent Dilip Kumar, commercial superintendent Ajay Kumar, SSE Amrendra Kumar, Rajiv Kumar, Ashutosh Jha, DCI Harikishor Bhakta, AEN Akhilesh Mishra, aur dusre railway officials maujood the.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

1959644 ★★★ 270Arpit~
6191858  13SreeNdl^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy