बिहार संपर्क क्रांति एक्सप्रेस में इमरजेंसी ब्रेक; बोगियों को पीछे छोड़ इंजन निकल गयाAn express train traveling on the Samastipur-Muzaffarpur rail line in Darbhanga suddenly separated into two parts. The engine and one coach detached from the rest of the train and moved forward about 100 meters. The loco pilot quickly applied emergency brakes, causing a commotion among passengers who disembarked the train. ...
more... The loco pilot and guard immediately informed the railway team, which responded and took further action. Fortunately, the quick thinking of the driver averted a major accident. The railway authorities appealed for calm amongst passengers. The train was brought back by the loco pilot and the engine was reconnected to the coaches. The train was then stopped at Pusa station for investigation. The DRM of Samastipur Railway Division, Vinay Srivastava, has ordered a senior DST to investigate the incident, which he stated is a case of malfunctioning coupling. The incident caused a delay of over an hour, and the train remained at Pusa station until 12:30 PM.
Darbhanga mein Samastipur-Muzaffarpur rail line par ek express train achanak do bhaago mein bant gayi. Chalti train ki ek bogi aur engine aage nikal gaya, baaki bogi peeche chhut gayi. Engine aur ek bogi karib 100 meter tak aage chal gaye. Fir loco pilot ne emergency brake lagaai toh hadkamp mach...
more... gaya. Train ke andar baithhe passengers bahar nikal gaye. Loco pilot aur guard ne railway team ko jald se jald bataya. Uske baad railway team ne aage ka kaam shuru kiya. Driver ki samajhdaar ke wajah se bada haadsa tal gaya. Railway ne passengers se shaanti banane ki appeal ki. Loco pilot ne train ko vapas laaya aur engine ko bogi se jod kar Pusa station par jaanch ke liye rok diya. Samastipur Railway Division ke DRM, Vinay Srivastava ne senior DST ko poore case ki jaanch ka order diya. Unhone kaha ki ye coupling mein problem ka case hai. Haadse ke wajah se train almost 1 ghante se zyada late hui. Train din ke 12:30 tak Pusa station par khadi rahi.