इंदौर-मनमाड़ के बाद खंडवा-बड़ोदरा रेलवे लाइन की बारी, सांसद गजेंद्र सिंह ने कहा- जल्द मिलेगीKhargaon MP, Gajendra Singh Patel, announced that the survey for the Khandwa-Vadodara railway line will begin soon. He also thanked Prime Minister Modi and Railway Minister Ashwini Vaishnaw for approving the Indore-Manmad rail project. This project will strengthen the infrastructure of the region and open up new possibilities for economic...
more... and social development. The Indore-Manmad railway project will feature a track capable of supporting trains traveling at 160 km per hour. The line will include 34 stations, 4 of which are existing and 30 are new. Of these, 18 stations will be located in Madhya Pradesh. The project will also involve the construction of 7 tunnels totaling 17.7 km in length, with the longest tunnel being 6.02 km.
Khargaon ke MP, Gajendra Singh Patel, ne kaha ki Khandwa-Vadodara railway line ka survey jaldi hi shuru hoga. Unhone Indore-Manmad rail project ke approval ke liye Prime Minister Modi aur Railway Minister Ashwini Vaishnaw ka dhanyavaad kiya. Yeh project area ke infrastructure ko strong karega aur economic aur social...
more... development ke naye opportunities khulega. Indore-Manmad railway project me banne wala track 160 km per hour ki speed se chalne wali train ko support karega. Is line me 34 stations honge, jisme se 4 purane hain aur 30 naye banaye jaayenge. Inme se 18 stations Madhya Pradesh me honge. Project me 7 tunnels bhi banayi jaayengi. Inki total length 17.7 km hogi. Sabse lambi tunnel 6.02 km lambi hogi.