Raebareli News: खराब एस्केलेटर की शुरू कराई मरम्मतThe escalator at Raibareli railway station has been undergoing repairs for about 20 days. While the escalator itself has been repaired, the issue of water leaking from the shed remains unresolved. This means the escalator is still not operational. The station sees an average of 25,000 passengers daily, with 30 to...
more... 35 trains stopping at the station. Passengers often need to change platforms, particularly those arriving from Lucknow, as their trains stop at platform 2 or 3. The escalator on platform 1 was installed to assist passengers who find it difficult to climb stairs.
Raibareli railway station ke escalator pe 20 din se repair chal raha hai. Ab escalator to theek ho gaya hai, lekin shed se pani dripping ka problem abhi bhi hai. Is wajah se escalator abhi bhi use nahi ho sakta. Har din 30 se 35 trains station pe rukti hai...
more... aur around 25,000 passengers aate jaate rehte hai. Lucknow se aane waale trains platform 2 ya 3 pe rukte hain, so passengers ko platform change karna padta hai. Platform 1 pe automatic stairs (escalator) banaya gaya hai taaki un passengers ko help ho sake jo stairs chadhne utarne me dikkat face karte hain.