Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sun Sep 15 03:05:05 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 534330
Dec 18 2023 (20:53) MMRDA Re-invites Tenders for Mumbai Metro's Line-12 (Orange Line)
Metro
MMOPL/Mumbai Metro
6881 views
0

News Entry# 534330   
  Past Edits
This is a new feature showing past edits to this News Post.
Stations:  Asnoti/AT   Dhakia Tiwari/DOT  
MMRDA floated tender for construction of 22-km long Mumbai Metro Line 12

The Mumbai Metropolitan Region Development Authority (MMRDA) has re-issued tenders for the civil construction of Mumbai Metro's Line-12 (Orange Line), a 22.17 km elevated line with 19 stations connecting Kalyan, Dombivali, and Amandoot (Taloja). This line will be an extension of the under-construction Line-5 (Thane – Bhiwandi – Kalyan). Originally planned...
more...
as two separate packages, the project has been consolidated into a single tender, CA-240, with an estimated cost of Rs 4,132 crore. The project's scope includes the construction of an elevated viaduct, 19 stations, and a connecting line to the depot. The northern terminal of Line-12 will now be at Kalyan Railway Station, incorporating two new stations from Line-5. Line-5's length has been shortened due to the integration of the Kalyan – Ganesh Nagar section into Line-12. This re-tendering reflects MMRDA's dedication to optimizing Mumbai's metro network and improving transportation within the city.

Mumbai Metro ki Line-12 (Orange Line) ke liye, MMRDA ne civil construction ke tenders dobara issue kiye hain. Yeh 22.17 km lambi line 19 stations ke saath Kalyan, Dombivali aur Amandoot (Taloja) ko connect karegi. Yeh under-construction Line-5 (Thane – Bhiwandi – Kalyan) ka extension hoga. Pehle do alag packages mein...
more...
plan kiya gaya tha, ab project ko ek single tender, CA-240 mein consolidate kiya gaya hai, jiska estimated cost Rs 4,132 crore hai. Project mein elevated viaduct, 19 stations aur depot se connecting line ka construction shamil hai. Line-12 ka northern terminal ab Kalyan Railway Station pe hoga, jisme Line-5 ke do new stations include kiye gaye hain. Line-5 ki length kam ho gayi hai kyunki Kalyan – Ganesh Nagar section ko Line-12 mein integrate kiya gaya hai. Ye re-tendering MMRDA ki dedication ko reflect karta hai ki Mumbai ka metro network optimize kiya jaaye aur city mein transportation improve ho.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy