ನಮ್ಮ ಮೆಟ್ರೋ ಕಾರಿಡಾರ್ ವಿಸ್ತರಣೆ: ಕಾರ್ಯ ಸಾಧ್ಯತಾ ಅಧ್ಯಯನ ವರದಿ ತಯಾರಿಕೆಗೆ ಟೆಂಡರ್ ಅಹ್ವಾನBangalore Metro Rail Corporation Limited (BMRCL) has invited bids for a feasibility study report to expand its network. The bids are open till March 27th, with a deadline of six months for submission. The report will cover the estimated construction cost, traffic survey, alignment, land acquisition, and potential challenges in land...
more... acquisition. The expansion plan includes two packages: a 50-km stretch with three corridors and a 68-km stretch with one corridor. This is the first step in the expansion process, and a detailed project report will be prepared after the government approves the feasibility study. The proposed expansion will extend the metro network to Anekal, Attibele, Sarjapur, Varthur, and Kadugodi Tree Park.
Bangalore Metro Rail Corporation Limited (BMRCL) ne apne network ko expand karne ke liye feasibility study report ke liye tenders maange hain. Bids March 27th tak submit ki ja sakti hain, aur report submit karne ki deadline six months ki hai. Report mein construction cost ka estimate, traffic survey, alignment, land...
more... acquisition, aur land acquisition mein aane wali mushkilon ka bhi analysis hoga. Expansion plan mein do packages hain: ek 50-km ka stretch jismein teen corridors hain, aur doosra 68-km ka stretch jismein ek corridor hai. Ye expansion process ka pehla step hai, aur government ke feasibility study ko approve karne ke baad ek detailed project report taiyar ki jaayegi. Proposed expansion Anekal, Attibele, Sarjapur, Varthur, aur Kadugodi Tree Park tak metro network ko extend karega.