न वंदे भारत, न तेजस....इस ट्रेन की एक झलक पाने को उमड़ी भीड़, 110 KM की स्पीड से दौड़ीOn March 21, 2024, a special train conducted a successful speed trial at 110 km/h on the newly doubled and electrified rail line between Khurahut and Sathianv in the Mau-Shahganj section of the Varanasi division. The trial was conducted after the Commissioner of Railway Safety (CRS) inspected the 18.9 km long...
more... stretch. The doubling work, which began in 2016-17, aims to improve passenger amenities, increase train speeds, and expand infrastructure. The CRS also inspected various aspects of the railway line, including crossings, yard plans, electronic interlocking systems, and the strength of bridges and culverts. Prior to the trial, the CRS had appealed to the public not to visit the section or allow their animals to enter the area during the inspection and speed trial.
21 March, 2024 ko, Varanasi division ke Mau-Shahganj section me, Khurahut aur Sathianv ke beech, newly doubled aur electrified rail line pe, ek special train ne 110 km/h ki speed pe successful speed trial kiya. Yeh trial Commissioner of Railway Safety (CRS) ne 18.9 km long stretch ki inspection karne ke...
more... baad kiya. Doubling ka kaam, jo 2016-17 me shuru hua tha, passenger amenities ko improve karna, train ki speed badhana aur infrastructure ko expand karna chahta hai. CRS ne railway line ke kai aspects ki bhi inspection ki, jisme crossings, yard plans, electronic interlocking systems aur bridges aur culverts ki strength shamil hai. Trial se pehle, CRS ne public se appeal ki thi ki wo inspection aur speed trial ke dauraan is section me na jayein aur apne animals ko bhi area me na jane dein.