Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Thu Sep 19 10:42:54 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 553518
May 24 (19:43) Mumbai Railways Gear Up for Monsoon Season with Extensive Preparations
Entry# 6074780   
  Past Edits
This is a new feature showing past edits to this News Post.
Mumbai Local News: CR, WR Commences Pre-Monsoon Measures

Central Railway (CR) and Western Railway (WR) are taking steps to ensure uninterrupted train services in Mumbai during the monsoon season. They've cleaned stations with corroded roofs to prevent material falling on EMU trains. WR has sealed AC units to prevent leaks and implemented measures to prevent water seepage through non-AC...
more...
train windows. To address track waterlogging, both CR and WR have installed dewatering pumps and are working on widening drains, micro-tunnelling, and building additional drains on the fifth and sixth lines. The BMC Storm Water Department will inspect culverts beneath tracks by June 5, and the civic body pays CR and WR for drain cleaning. To minimize flooding, tracks have been raised, and Nullah cleaning operations are ongoing and expected to be completed before the monsoon.

Mumbai mein monsoon season ke aane se pehle, Central Railway (CR) aur Western Railway (WR) Mumbai ke residents ke liye train services chalate rakhne ke liye measures le rahe hain. Unhone corroded roofs waale stations ko saaf kiya hai taki EMU train pe material na gire. WR ne AC units ko...
more...
sealed kiya hai leak se bachne ke liye aur non-AC train ke windows se pani seeping na hone de. Track waterlogging ko rokne ke liye, CR aur WR dono ne dewatering pumps install kiye hain aur fifth aur sixth line pe drains ko wide karne, micro-tunneling karne aur additional drains banane ka kaam kar rahe hain. BMC Storm Water Department June 5 tak tracks ke neeche culverts ka inspection karega aur civic body har saal CR aur WR ko drains saaf karne ke liye paise deta hai. Flood ka risk kam karne ke liye tracks ko upar kiya gaya hai aur Nullah ki safai ka kaam chal raha hai aur monsoon aane se pehle khatam hone ki umeed hai.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy