Indore Metro Rail Project: इंदौर में मेट्रो रेल की अंडरग्राउंड राह से जनता को मिलेगी राहत, लेकिन 3 की जगह 5 साल में होगा ये कामIndore's Metro Rail project is facing a route change proposal due to concerns from residents and representatives about potential disruptions. The current plan involves an elevated section from Robot Square to High Court via Palasia, and an underground section from Regal to Airport. The proposed change aims to shift the elevated...
more... section to an underground route between Khajrana and Bengali Square, potentially reducing construction time from three to five years, but increasing the cost from 543 crore to 1200 crore rupees. This change would utilize the existing alignment and minimize disruption to traffic on MG Road. A 'cut and cover' tunnel is being considered for the underground section, avoiding the need to demolish buildings in the Kanadia area. A one-month survey has been requested by the Urban Administration Minister to assess feasibility and impact. The change aims to minimize construction time and costs while addressing concerns over traffic disruptions and property demolition.
Indore mein Metro Rail project ke route mein change karne ka proposal aa gaya hai, kyunki residents aur representatives ko construction ke wajah se problem ho sakti hai. Abhi plan hai ki Robot Square se High Court tak Palasia se hoke elevated section bane aur Regal se Airport tak underground section....
more... Naya proposal hai ki Khajrana aur Bengali Square ke beech elevated section ko underground kar diya jaaye, jisse construction time three se five saal ho jaayega, lekin cost 543 crore se badhkar 1200 crore rupees ho jaayegi. Is change se MG Road par traffic jam kam hoga aur existing alignment use kiya jaayega. Underground section ke liye 'cut and cover' tunnel banane ki baat ho rahi hai, jisse Kanadia area mein building todhne ki jarurat nahi padegi. Urban Administration Minister ne feasibility aur impact check karne ke liye ek maah ka survey karne ka order diya hai. Is change se construction time aur cost kam hoga aur traffic disruptions aur property demolition ki problem bhi kam hogi.